100 kW solar system: cost, output and payback (2026)

What 100 kW of solar costs, makes and saves a business, with every assumption shown. It often suits a factory, a supermarket, a school or a mid-sized warehouse.
Factory with a sawtooth roof covered in solar panels

100 kW at a glance

Quick facts for planning. Each is explained further down, with where the number comes from.
Panels
about 228
at 440 W each (assumed)
Panel area
about 502 m²
at 2.2 m² a panel, before access paths
Output
119 to 154 MWh a year
across the eight capital cities
Certificates
small-scale STCs
declining each year to 2030

What does a 100 kW system cost?

Average prices from Solar Choice, a solar comparison and tender site (not a government source), for September 2026. They are the total installed price after STCs and including GST, and leave out meter installation, ground-mounting, grid protection and grid connection studies. Checked 31 October 2026.
Average 100 kW price by city, after STCs, including GST
CityAverage price
Sydney$88,850
Melbourne$77,310
Brisbane$85,170
Adelaide$83,900
Perth$83,410
Hobart$70,730
Canberra$81,650
Average of all cities$81,570

Solar Choice has no Darwin figure. Most GST-registered businesses claim GST back, so divide by 1.1 for a rough ex-GST price. Quotes vary a lot with the roof, the network and the installer.

How much does 100 kW make in each capital?

Annual output is the system size times the Clean Energy Regulator’s zone rating for the city centre postcode, times 1,000. It is a deemed figure, not a forecast for your roof.
Annual output of a 100 kW system by capital city
CityPostcodeZone (rating)kWh a yearCertificates
Sydney20003 (1.382)138,200691
Melbourne30004 (1.185)118,500592
Brisbane40003 (1.382)138,200691
Adelaide50003 (1.382)138,200691
Perth60003 (1.382)138,200691
Hobart70004 (1.185)118,500592
Canberra26003 (1.382)138,200691
Darwin08002 (1.536)153,600768

Certificates assume installation on 1 November 2026. Rating in MWh per kW per year.

Panels and roof

At an assumed 440 W per panel, 100 kW is about 228 panels, covering roughly 502 m² (2.2 m² a panel).
  • You need more roof than the panel area: walkways for maintenance, setbacks from edges, and gaps between rows if the panels are tilted on a flat roof.
  • The roof must carry the load. Older or sheet-metal roofs may need a structural engineer’s report, and asbestos roofs are a separate problem to solve first.
  • Your installer’s panel size will differ from our assumption, so the panel count will too. Ask for the layout drawing.

Which certificates does it get, and why?

100 kW is inside the small-scale scheme, which covers systems up to and including 100 kW.

It earns small-scale STCs: size × zone rating × deeming years, rounded down. The deeming period is the number of years left until the scheme ends in 2030: 5 for 2026, 4 for 2027, 3 for 2028, 2 for 2029 and 1 for 2030. So waiting a year costs about 139 certificates in zone 3, roughly $4,865 at $35 each.

Try your own postcode and date in the STC calculator, and read our guide to commercial solar rebates.

Network approval

Systems over about 30 kW usually need the local network’s approval before they are switched on, and sometimes studies, protection equipment or limits on how much you can export. That can add cost and weeks or months.

Start the application early, and ask each installer who pays for studies and what happens if the network says no. Read our guide to grid connection.

A worked payback example

A Monday to Friday business in Sydney using 207,000 kWh a year (about 1.5 times what a 100 kW system makes), open 7am to 5pm. Your business will differ, so use this to see how the sums work, not as a promise.
Output in year 1
138,200 kWh
Used on site (modelled)
75%
Saving in year 1
$26,966
Installed price
$105,000 excluding GST
Certificates (small-scale STCs)
691 worth $24,185
Net cost
$80,815
Simple payback
3.1 years
25-year NPV at 7%
$274,620
IRR
33.7%
Cost per kWh over its life
6.4c

Assumptions in this example

  • Electricity rate avoided: 25 c/kWh excluding GST, rising 2.5% a year.
  • Export rate: 3 c/kWh, held flat.
  • Installed price: $1,050 per kW before certificates, excluding GST.
  • Certificates at $35 each; installed 1 November 2026.
  • Output falls 0.5% a year; maintenance $12 per kW a year, rising with prices; 25 years.
  • Discount rate 7%.
  • Not included: demand charges, batteries, finance costs, tax and depreciation, network costs, inverter replacement.

Run your own numbers

Questions about 100 kW systems

How much does a 100 kW commercial solar system cost?
Solar Choice, a comparison site, put the average installed price of a 100 kW system at $81,570 across Australian cities in September 2026, after STCs and including GST. It excludes metering, ground-mounting, grid protection and connection studies, so quotes can be higher.
How much electricity does a 100 kW system make?
About 118,500 to 153,600 kWh a year, depending on the city, using the Clean Energy Regulator’s zone ratings (size × rating × 1,000). In Sydney that is 138,200 kWh. Real output varies with shade, tilt, orientation and dirt.
Does a 100 kW system get the solar rebate?
Yes. Systems up to 100 kW earn small-scale STCs: size × zone rating × the years left until 2030. Installed in 2026 that is 5 years, so about 691 certificates in Sydney, worth roughly $24,185 at $35 each.
How many panels and how much roof does 100 kW need?
About 228 panels at 440 W each, covering roughly 502 square metres of panel area. You need more roof than that for access paths, edge setbacks and tilt-frame spacing, and the roof must be strong enough and not heavily shaded.
Is a 100 kW system the right size for my business?
It often suits a factory, a supermarket, a school or a mid-sized warehouse. The right size depends on how much power you use in daylight, not how much roof you have. The usual mistake is a system bigger than your daytime use, which exports surplus at a low rate. Run your numbers in the calculator.
When is solar not worth it for a business?
When you rent with a short lease, plan to move, mostly use power at night, have a shaded, fragile or asbestos roof, or can’t get the network’s approval to connect. In those cases, ask about energy efficiency first, or a lease with the landlord’s agreement.

Ready to compare real numbers?

Run your own figures first, then ask at least three accredited installers to quote on the same brief. Quotes are free and you’re under no obligation.